Designing a horizontal well screen begins after the consulting engineer determines that the project site, the contaminant, and the remediation goals are conducive to a Horizontal Remediation Well system. Once the horizontal well screen design is completed, a horizontal well pipe slotter is contacted and given the engineered specifications. The horizontal well screen is then manufactured and shipped to the project site.
If not already provided, Directional Technologies will request the following information for the design of the horizontal well screen:
Horizontal well screen is custom designed to meet several competing success criteria: