Here at Directional Technologies, Inc, we specialize in utility directional drilling projects. We have directionally drilled thousands of pipelines for electric conduits, gas conduits, fiber optic cables, sewerage, water, and more.
Directional Drilling for Utilities allows for conduit placements underneath obstacles (like streets, rivers, buildings) and provides maximum protection while, at the same time, minimizing maintenance costs.
Utility companies who use it to install power cables with minimal disruption of other utilities on their property; environmental remediation industry that needs to clean up toxic chemicals from contaminated sites by excavating them out safely below surface level using HDDs.
Directional Boring Electrical Conduit, also known as DBE or Directional Bore, is a drilling process for installing underground electrical conduit and gas. This process is preferable to open trenching because it prevents the disruption of traffic and eliminates the need to remove sidewalks and streets.
Directional boring water and sewer lines is a process of underground drilling to create tunnels. It is a cost-effective, efficient, and environmentally friendly way to install new or replacement pipes in areas where traditional digging methods are not feasible.
Directional Boring Fiber Optic is the process of drilling a hole in the ground and inserting a fiber cable. Directional Boring Fiber Optic has many applications, including telecommunications, transportation systems, and more.
We Solve Complex Infrastructure Projects
“Regardless of the extent of work, your project may be of a very critical and technical nature and require what Directional Technologies Inc alone can bring to the table”.
We offer powerful drilling rigs so we can tackle larger-sized conduit installations via horizontal directional drilling.
Our expertly trained crew has thousands of installations under their belt.
Our staff have top electrical, engineering, and geology backgrounds so that your job gets done right the first time.
Gloucester, MA, a city split in half by the Annisquam River, has had a notorious history of water main breaks, leaving parts of the city without H20 for an extended period of time.
Directional Technologies to installed a 1,200-foot PVC (polyvinyl chloride) water main pipe solving their water worries once and for all. While this $2.5 million project initially may have left some tax payers wary, the new water main has already proved to not only be money well spent, but a great solution to their problems.
It’s a very cutting edge approach, it’s a very progressive way to get utilities into the ground.” …The new, giant water main will serve some 70 percent of Gloucester’s residents – including everyone on the city’s island side of the river, and should continue to carry water from Bond Hill to residents for at least 200 years. That’s right, 200 years – nearly double the age of many of the pipes city crews have had to service in the last decade.”
Larry Durkin
Advantages of Directional Drilling for pipe installations include:
-Continuation of normal operation
-Avoidance of identified infrastructure installations
-Maintain the integrity of roadways, buildings, and natural features
-Little or no disturbance to wetlands or nature conservators.
At Directional Technologies. Inc, a directional drill for utility does not exceed 100 feet deep underground.
Yes, new technology allows horizontal directional drillers to drill and steer through rock.
Directional boring costs can vary depending on the job. Feel free to reach out and we can give you an idea based on your project.
Let’s explore what a strategy from Directional Technologies can do for your next Utility drilling project.
Directional Technologies, Inc.
77 North Plains Industrial Road, Wallingford, CT 06492
Over 5,000 Horizontal Remediation Wells Installed Worldwide
Design by Suited. Copyright 2024 Directional Technologies, Inc. All Rights Reserved