The Horizontal Solution to ERH Electrode Placement
ERH electrodes are distributed in the subsurface to create a network of triangular electrode groupings in cross section. The purpose of such a configuration is to optimize the distribution of heat across the target zone, from top to bottom. One set of electrodes is placed at a shallow horizon within the target zone, and another set is placed at a deep horizon. Shallow and deep electrodes are staggered, so that they don’t overlie each other.
Vertically the target zone reaches from 2 to 15 feet below ground surface (bgs), but horizontally it spans a 17,000 square foot area of the building. Electrodes are placed at only two different elevations, but multiple electrodes are placed along a given horizontal traverse. Installing electrodes within horizontal casings is therefore much more efficient than installing them in vertical casings. The flexibility of shifting electrodes within a horizontal casing that extends 200 feet across the building is an additional benefit of using horizontal drilling to install the electrodes. This flexibility will allow the ERH to be optimized in the course of its operation, as some portions of the target zone remediate more quickly than others.
Hybrid ERH/ and SVE Wells
The shallow ERH casings served double duty as soil vapor extraction (SVE) wells. Alternating sections of the pipe were slotted for SVE, or solid for ERH. This configuration avoided the logistical problem of threading SVE wells into the network of ERH electrodes.
Horizontal Electrode Pipe Installation
Heavy, rigid black steel casing with 6-inch diameter was used for installing the ERH system. Directional Technologies employed both blind and entry-exit installation methods for the horizontal ERH system. Each black steel casing was welded onto the casing string as it advanced into the wellbore. See the illustration at the top of this email. The shallow wells were only 3 feet below the building slab, so the drilling method was adapted to minimize communication through cracks in the foundation. A grout seal was emplaced around the pipe where it crossed below the building foundation in order to prevent short-circuiting of the SVE system. Installation of the deep wells 14 feet bgs in weathered sandstone and gravel formation was challenging because of the weight and limited flexibility of the black steel casing. In completing the ERH casing under the manufacturing facility, Directional Technologies Inc. brought to bear its 20 years of experience directionally drilling in every form of soil, sediment or igneous and metamorphic rock.
Round-the-clock site operations using sensitive milling equipment continued unabated by the directional drilling work in yet another example of Directional Technologies tradition of partnering with consultants and site owners/operators to ensure successful and unobtrusive remedial system operation.
_______________________________________________________________________
Directional Technologies is the nation’s expert horizontal remediation well drilling contractor. We design and install horizontal remediation wells. Directional Technologies’ experience in the oil field, environmental remediation and utility industries allows us to complete projects that were previously considered unfeasible. Our company personnel have been successfully directional drilling horizontal wells since 1984!
For additional information contact
Kathy Sequino
203-294-9200
877-788-4HRW
ksequino@directionaltech.com
www.directionaltech.com
|